Frequently Asked Questions
-
What is the name of the new school?
The name of the new school is Autumn Creek Elementary.
-
Who is the new school designed to serve?
The new school is designed to relieve overcrowding. It is the district's goal to establish boundaries for the new campus during the 2020-2021 school year so that they are in place a year prior to the school's opening.
-
Will bus transportation be provided to the new school?
Humble ISD provides bus transportation to students who live more than two miles away or who must cross a hazardous thoroughfare.
-
Who will be the principal of the new school?
Humble ISD welcomes Paul Edwards as the Founding Principal of Autumn Creek Elementary. Read more about Mr. Edwards.
-
Will I know any teachers at the new school?
When new schools open to relieve overcrowding, some existing teachers follow their students to the new school.
-
What are the results of the Elementary Input Survey?
Participants in the parent survey received a unique link to respond to their parent input survey. 22% prefered the grade level structure to be one elementary school for grades K-2, and another elementary school for grades 3-5. 78% prefered the grade level structure to be two elementary schools, each with serving grades k-5.
The district also posted an online form on the Fall Creek Elementary School campus website for community members to provide input. There were 136 comments. Of the 136 comments, 106 indicated a preference for a specific grade-level structure. 17% expressed a preference for a K-2 campus and a Grades 3-5 campus. 83% expressed a preference for two campuses Grades K-5.
-
What is the proposed timeline for building Autumn Creek Elementary?
It takes no less than 16 months to construct an elementary school after the district has signed a contract with a general contractor and there are permitted drawings. The steps in building Autumn Creek Elementary and projected timeline would be:
- Design Phase Prototype (June 2019 - November 2019)
- Permitting and Bidding (November 2019 - March 2020)
- Construction (March 2020 - July 2021)
- Open August 2021